New Wernick Building Wickford

Wernick Group Invests £3 Million in New Head Office Development

By Wernick Buildings Limited in Industry News

The Wernick Group has announced today that it is redeveloping its Wickford premises. This will include the demolition of the existing office and the construction of two new office buildings on either side of Russell Gardens. 

The current Head Office at Molineux House is used by both Wernick Hire and Wernick Buildings as a depot and Divisional office, as well as centralised Wernick Group functions such as HR and Finance. The two new buildings will provide dedicated space for Group Head Office staff, with a separate building for Wernick Buildings and Wernick Hire staff.

The two offices will represent the spectrum of products supplied by Wernick. While a straightforward approach will be taken in the construction of the Divisional Office and Depot, the new Head Office has been designed by Wernicks in-house architects to push the limits of offsite construction and uses their most advanced building system. It will feature a high quality internal finish and is designed to achieve a BREEAM rating of Excellent.

Chairman David Wernick commented; “I am very excited by the new development at Wickford. Not only will staff benefit from a new and improved working environment, but the new Head Office allows us to show off what is possible with modular construction.”

Both buildings will be constructed at Wernicks dedicated manufacturing facility in South Wales, before being transported to site and installed by the Wickford team.

www.wernick.co.uk